Installation and use rules for valve regulated sealed lead-acid (gel) batteries

Battery installation

        1, because the battery with liquid charge factory, after opening the box when handling, please move the bottom of the battery, to be gently held and put, do not hold the terminals to move the battery, not to use the terminals to lift the battery.

        2, it is strictly prohibited to open the battery valve, otherwise it will lead to poor sealing of the battery, affecting the performance and life of the battery.

        3, the same group of batteries should be the same specification products, not allowed to mix the products made by different manufacturers.

        4, the battery should be used in well-ventilated conditions, do not allow the battery to be installed in a closed container or space. Avoid direct sunlight and keep away from heat generating objects.

        5. When installing, please use insulated tools to avoid electric shock.

        6, the installation of the battery should fully consider the heat dissipation of the battery, the distance between the batteries should be maintained at least 10mm.

        7, battery wiring, please connect the batteries to each other. Then, connect with the charging equipment and load. Connect the positive and negative terminals of the battery to the positive and negative terminals of the charging equipment and the load. And carefully check whether the bolts and nuts are tightened (the torque of the connecting bolts is about 1N.m)

        8, to get the expected service life, please choose the automatic current limiting and voltage regulating charging equipment with over-voltage, under-voltage and over-current protection of ±1.5% of the regulating accuracy, and the ripple current should be controlled within ±0.05C10.

        9, battery replenishment

The battery should be in a fully charged state when it is put into operation. After the installation is completed by replenishment of electricity before use, according to the length of the storage period of the battery, replenishment system please refer to "Table I".


Storage timeReplenishment system (current ≤ 0.25 C10)
Not more than 2 monthsNo need to replenish electricity, directly carry out the use
Not more than 6 monthsCharge at 2.3V/unit constant voltage for 48 hours, or 2.4V/unit voltage for 24 hours.
Not more than 12 months96 hours of constant voltage charging at 2.3V/single, or 48 hours of voltage charging at 2.4V/single.
Not more than 24 months144 hours of constant voltage charging at 2.3V/single unit, or 96 hours of voltage charging at 2.4V/single unit.


Use

        1, the maximum permissible discharge current is shown in Table II


Maximum discharge currentMaximum discharge time
3C103min



        Damage to the battery may occur if the maximum discharge current of the battery is exceeded or if the maximum discharge time is exceeded at the maximum discharge current.

        2, the battery should not be left for a longer period of time after discharging, and should be charged immediately after discharging and brought to a fully charged state.

        3, Float charging operation

        Under the environment of standard temperature 25℃. The float charging voltage is 2.23V/unit. If the ambient temperature is higher than 25℃, the float charging voltage should be decreased and vice versa should be increased. Float charging voltage correction factor is ±3mv/°C/monomer.

        4. Cycling

        4.1 If the battery is in cycling state, it shall be charged according to the following principles.

        When the ambient temperature is 25℃, the initial maximum current of battery charging shall be controlled within 0.25 C10. Charge at the equalized charging voltage of 2.35~2.4V of single cell voltage, the specific charging time is as follows "Table III". (If the ambient temperature is higher or lower than 25℃. (If the ambient temperature is higher or lower than 25℃, the correction factor of equalized charging voltage is ±4mv/℃/single cell.)


Total charging time (h)Total charging time (h)

  

Depth of dischargeConstant current initial current valueTotal charging time (h)
20%0.25 C108
50%0.25 C1012
80%0.25 C1016
100%0.25 C1024


        4.2 If the device can only be charged in the state of the float charging voltage. The replenishment time is shown in "Table IV".

  

Depth of dischargeConstant current initial current valueTotal charging time (h)
20%0.25 C1012
50%0.25 C1024
80%0.25 C1048
100%0.25 C1096


The above charging time is a reference value, as the battery is in use, or the ambient temperature is lower than 25℃±5℃. The charging time should be extended accordingly.

        5, the best use of the battery ambient temperature is 25 ℃ ± 5 ℃.

        Inspection and maintenance of battery during operation

        1, the battery should be inspected and maintained during operation, and complete operation records should be made accordingly.

        2. Regularly check the appearance and voltage of the battery. Specifically as follows:

        2.1 Check once a month: 1) Mainly check whether the total value of the battery's float voltage is consistent with the provisions of "II.3". 2) Each battery should be adjusted. 3) Each battery's float voltage should be adjusted. 4) Each battery's floating voltage should be adjusted. Otherwise, adjustments should be made. 2) Whether the float charging voltage of each individual battery is in accordance with the deviation range of ±0.1V/individual battery. Otherwise, the manufacturing company should be notified to deal with it. 3) Check the battery for night leakage, damage, etc. 4) Check the battery connecting wires for looseness. 5) Check the safety valve for looseness.

        2.2 Three-month inspection: 1) Repeat the items of one-month inspection. 2) The batteries that have not been deeply discharged during the operation of the battery pack shall be deeply discharged once, and the depth of discharge is generally required to be discharged to the voltage of the battery single unit between 1.85~1.90V. And record the discharge time and discharge current. After discharging, charge according to "4.1 and 4.2".

CAUTION

        1. Do not allow the battery to be close to the fire source, and do not allow the battery to be put into the fire under any circumstances.

        2, when sulfuric acid touches the human body or clothes, it should be immediately flushed with water, splashed into the eyes immediately with a large amount of water, and should be immediately close to the nearest medical care.

        3, for installation, inspection, maintenance, should be strictly in accordance with the electrician's regulations. Pay attention to the use of protective tools and facilities.

        4, when cleaning the battery, please note that it can not be carried out with objects that are easy to generate static electricity. Do not use organic solvents. Only use a slightly damp cloth to clean.



Rules for installation and use of solar batteries

Battery Installation

        1, because the battery with liquid charge factory, after the opening of the box when handling, please move the bottom of the battery, to be gently held and put, not to move the battery with a hand holding the terminals, not to use the terminals lifting the battery.

        2, it is strictly prohibited to open the battery valve, otherwise it will lead to poor sealing of the battery, affecting the use of battery performance and service life.

        3, the same group of batteries should be the same specification products, not allowed to mix the products made by different manufacturers.

        4, the battery should be used in well-ventilated conditions, it is not allowed to install the battery in closed containers or space, the battery should pay attention to the waterproof and set up ventilation holes when it is buried in the ground, it should be avoided from direct sunlight, and kept away from hot objects.

        5. When installing, please use insulated tools to avoid electric shock.

        6. When wiring the batteries, please connect the batteries to each other. Then, connect with the controller.

        7, to get the expected service life, please use the automatic current limiting and voltage regulating charging equipment with over-voltage, under-voltage and over-current protection ±1.5% of the regulating accuracy.

        Inspection and maintenance

        Do inspection and maintenance work when the battery is running, and complete operation records should be made.

        1. Regularly check the battery appearance, voltage, etc..

        2. Battery one month check content.


Items ContentsBaselineDisposition
Total battery voltage in float chargingRead the index value of the voltmeter on the control panelTotal battery voltage in float charging 67}}Float voltage x number of batteriesFloat voltage x number of batteries


3. Six-month check of batteries


Items elementsBenchmarksDisposition
1. Total Battery Voltage


1. Measure the total battery voltage with a 0.5-rated voltmeter

2. Read the index value of the voltmeter on the control panel

Total battery voltage (float voltage x number of cells)

1. Adjust the voltage value when it deviates from the reference

2. Repair or replace if the error is larger than the permissible value

2. Voltage of all the single batteries

Measure the total voltage of the batteries with a 0.5-level voltmeter

Voltage deviation is less than or equal to plus or minus 0.1V/single cell

When the voltage value of a cell exceeds the benchmark, observe the cell for 2 months and it is still not back to normal, please contact the company or replace it

3. Battery Appearance

Check for damage, leakage


Check for the cause, such as cracks in the case, replace the

Dust


Clean the area with a damp cloth

Check for loose terminals on connecting wires


Tighten the bolts and nuts


Battery storage

1. The battery should be parked in a dry, ventilated, cool environment. The battery should be parked or stored in dry, ventilated and cool environment, and it is forbidden to be exposed to moisture and rain.

2, the battery in the process of placing, due to self-discharge and loss of capacity, its first discharge capacity will be lower than the rated capacity, usually after 2-3 charge/discharge cycles can reach its rated capacity.

3, when the battery is left unused for a long period of time, it is necessary to replenish the battery regularly, the replenishment cycle is shown in the following table


Storage period Replenishment system
Not more than 2 monthsNo need to replenish the electricity, use directly
Not more than 6 monthsAt 2.30V/ Single constant voltage charging 48h(2d)
Not more than 12 monthsat 2.30V/ Single constant voltage charging 96h(4d)
Not more than 24 monthsConstant voltage charging at 2.40V/unit for 120h (5d)


After-sales service

        1, our company provides users with free selection service and assists in the design of the whole solar or wind energy system.

        2, the user receives the goods within three months, such as the product itself has any objections, the company is responsible for the exchange.

        3, the company receives the user's service information, within twenty-four hours to give a clear answer, timely service.

        4, according to the user's requirements, on-site installation guidance and commissioning.

        5, at the request of the customer can provide valve-regulated sealed lead-acid battery use, maintenance technology training.

        6, the establishment of perfect user files and high-speed and efficient service team, regular visits to the user, even if to solve the user to use the product in the process of various problems and difficulties.

        7, widely adopted by the customer on the use of products and various requirements of information, continuous improvement and refinement of existing products and services to meet the special requirements of different users timely development of products to continue to provide customers with satisfactory products and services for the purpose.

Battery maintenance knowledge

        1, battery cleaning please use as much as possible wringing wet rags to carry out, please do not use a dry cloth or duster, etc., the use of a dry cloth or duster will produce static electricity, and sometimes become the cause of the ignition, explosion.

        2. Replace the battery within the battery replacement time stated in the instruction manual or on the machine.

        3. When the battery reaches the end of its life (50% of the initial discharging time), the time of use may be significantly shortened. This may cause battery failure such as internal short-circuit, depletion of electrolyte (increase in internal resistance), or corrosion of the positive plate grid. If use continues in this condition, the maximum charging current will flow continuously, and heat dissipation and leakage of the battery will be possible, so please replace the battery before it becomes this condition.

        4. Do not use organic solvents and liquid detergents such as Shinna water, gasoline, kerosene, volatile oils, etc. If organic solvents and liquid detergents come into contact with the battery tank, they may become the cause of cracks and leakage of fluid from the tank.

        5, the battery terminals should be used in a clean state, if the battery terminals are dirty, poor contact with the body, it may be the cause of power cut off, can not be charged.

Disposal of abnormalities in the battery

        There is sulfuric acid inside the battery, if the battery leakage liquid gets on the skin and clothes, please wash it with a lot of clean water immediately, and if the liquid splashes into the eyes, please wash it with a lot of clean water and then consult a doctor as soon as possible. Dilute sulfuric acid in the eyes may cause blindness, and on the skin may cause burns.